Design · Permitting · ConstructionSupported by NbotaiOS470.426.4550

Electrical + lighting engineering

Connect power, lighting, and building operations.

PRM coordinates electrical distribution, lighting, controls, and system interfaces around the building's equipment and occupants. The work aligns utility service, connected loads, equipment locations, and installation requirements.

Electrical + lighting engineering project coordination illustration
PRM / Integrated delivery
“

Clear scope, coordinated information, and accountable decisions from planning through delivery.

What PRM brings

What to bring to the first conversation.

Plan the work

Service and distribution planning, one-lines, and load information. Panel schedules, circuiting, feeders, and equipment connections.

Coordinate the details

Interior and exterior lighting layouts and fixture schedules. Lighting-control zoning and operational intent.

Carry it through

Electrical plans, details, diagrams, and schedules. Utility, equipment-vendor, and specialty-system coordination.

01

Service planning + electrical distribution

Electrical design begins with the available service and the loads the project must support. Existing equipment, utility coordination, major mechanical loads, tenant requirements, and future needs inform the distribution strategy. Space and access requirements are coordinated with architecture and structure.

  • Service and distribution planning, one-lines, and load information
  • Panel schedules, circuiting, feeders, and equipment connections
  • Grounding and bonding coordination
  • Existing-system modifications and planned shutdown interfaces
02

Lighting, controls + low-voltage interfaces

Lighting is developed with the architectural plan, ceiling design, task needs, and operating schedule. Power and pathways for communications, security, access control, and other specialty systems are coordinated with the responsible vendors to make scope and infrastructure requirements explicit.

  • Interior and exterior lighting layouts and fixture schedules
  • Lighting-control zoning and operational intent
  • Emergency and egress-lighting coordination
  • Technology, security, and low-voltage pathway interfaces
03

Electrical documentation + field support

The electrical package connects distribution intent to coordinated installation information. PRM reviews equipment submittals and changes within scope, tracks impacts on related disciplines, and helps resolve technical questions during construction. Specialist studies and testing are defined for each assignment.

  • Electrical plans, details, diagrams, and schedules
  • Utility, equipment-vendor, and specialty-system coordination
  • RFI, submittal, and substitution review
  • Startup, testing, identification, and closeout documentation interfaces

Working relationship

What to bring to the first conversation.

PRM tailors the deliverables, participating disciplines, and level of support to the assignment. Share what is available; the team will identify missing inputs, confirm responsibilities, and define the next useful milestone.

  • Existing service and panel information
  • Mechanical, kitchen, process, and owner equipment schedules
  • Lighting preferences, technology needs, and construction phasing

Common questions

Define the next step.

Can this service be part of a broader PRM assignment?

Yes. PRM can coordinate this scope with the other architecture, engineering, BIM, and construction services required for the project. The proposal identifies the included deliverables, responsibilities, assumptions, and milestones.

What if the project is already in progress?

Send the current drawings, open issues, review comments, and immediate deadline. PRM will first assess the available information and define a practical scope for joining the work.

Bring the real constraint

Let’s define what the project needs next.

Share the location, current documents, target milestone, and the decision that cannot slip.

Start the conversation