Plan the work
Conceptual budgets, quantity takeoffs, and trade-level estimating. Scope assumptions, exclusions, contingencies, and allowances.
Preconstruction, estimating + procurement
PRM connects feasibility, estimating, constructability, procurement, and scheduling before construction commitments are made. Estimates are developed around stated quantities, assumptions, exclusions, market inputs, and the level of design information available.

Clear scope, coordinated information, and accountable decisions from planning through delivery.
What PRM brings
Conceptual budgets, quantity takeoffs, and trade-level estimating. Scope assumptions, exclusions, contingencies, and allowances.
Bid package preparation and scope descriptions. Bid leveling, qualifications, exclusions, and clarification records.
Constructability reviews and design-interface workshops. Phasing and logistics input for occupied or constrained sites.
Early budgets support feasibility; detailed estimates support specific purchasing and construction decisions. PRM organizes costs by scope and trade, distinguishes allowances from defined work, and makes the estimate basis visible. Quantity information is reconciled to drawings, specifications, and models.
Procurement decisions require comparable scopes. PRM helps organize bid information, clarify inclusions, track responses, and review gaps or overlaps. Long-lead equipment, approval dependencies, fabrication periods, and delivery constraints are incorporated into the project schedule.
Preconstruction closes the gap between a design intention and an executable work package. The team reviews access, sequence, interfaces, temporary conditions, owner decisions, and unresolved information. Recommendations identify the cost or schedule issue and the decision required to resolve it.
Working relationship
PRM tailors the deliverables, participating disciplines, and level of support to the assignment. Share what is available; the team will identify missing inputs, confirm responsibilities, and define the next useful milestone.
Common questions
Yes. PRM can coordinate this scope with the other architecture, engineering, BIM, and construction services required for the project. The proposal identifies the included deliverables, responsibilities, assumptions, and milestones.
Send the current drawings, open issues, review comments, and immediate deadline. PRM will first assess the available information and define a practical scope for joining the work.
Bring the real constraint
Share the location, current documents, target milestone, and the decision that cannot slip.