Plan the work
Energy, water, comfort, and operational objectives. Envelope and building-system performance coordination.
Sustainability + building performance
PRM integrates energy, water, materials, durability, and operational needs into design coordination. Performance objectives are considered alongside cost, constructability, maintenance, and the information needed to evaluate alternatives.

Clear scope, coordinated information, and accountable decisions from planning through delivery.
What PRM brings
Energy, water, comfort, and operational objectives. Envelope and building-system performance coordination.
Envelope, HVAC, lighting, and controls coordination. Water-use strategies and equipment selection interfaces.
Design narratives and selected performance criteria. Submittal review against agreed requirements.
Meaningful performance work starts with a baseline and a defined target. For new projects, the team identifies owner priorities and relevant design criteria. For renovations, available utility data, existing equipment, envelope conditions, and operating practices inform improvement opportunities.
PRM helps compare options in the context of the whole building. A lower first cost can have different maintenance and operating implications; equipment changes can affect structure, power, space, and access. Assumptions and evidence are kept visible when assessing alternatives.
Performance goals need to survive substitutions, field revisions, and handover. PRM coordinates requirements in drawings and submittals, identifies commissioning interfaces, and organizes the information needed for operations. Certification support and specialist studies are defined separately in the scope.
Working relationship
PRM tailors the deliverables, participating disciplines, and level of support to the assignment. Share what is available; the team will identify missing inputs, confirm responsibilities, and define the next useful milestone.
Common questions
Yes. PRM can coordinate this scope with the other architecture, engineering, BIM, and construction services required for the project. The proposal identifies the included deliverables, responsibilities, assumptions, and milestones.
Send the current drawings, open issues, review comments, and immediate deadline. PRM will first assess the available information and define a practical scope for joining the work.
Bring the real constraint
Share the location, current documents, target milestone, and the decision that cannot slip.
Start the conversation